Blog

Greenway Bridge Deck Improvement Project | Raleighnc.gov

Thank you for printing this page from the City of Raleigh's Official Website (www.raleighnc.gov) https://raleighnc.gov/projects/greenway-bridge-deck-improvement-project 02/01/2023 6:37 pm

The Project includes the replacement of timber decking on several bridge structures located along the Neuse River Trail at mile markers 2.75  and 11.5 using Fiber-Reinforced Plastic (FRP) decking material. Additionally, the project includes the replacement of timber decking on the bridge structure located along the House Creek Trail at mile marker .25.  The timber decking at this location will be replaced with concrete.  Frp Handrails Fitting

Greenway Bridge Deck Improvement Project | Raleighnc.gov

These greenway bridge deck improvements will provide an improved non-slip deck surface condition.

The consultant design team has completed the 100% design construction plans and have been submitted for permit review.  Once the final construction plans and permits have been approved, the projects will be publicly bid for construction.

Greenway Bridge Deck Improvement Project | Raleighnc.gov

Mini Mesh Fiberglass Grating The Capital Area Greenway System was first adopted by City Council in 1976. This plan proposed a system of linear parks located primarily along rivers, streams, and creeks, and included the opportunity for an interconnected system of pedestrian trails across the region.